Pre-construction termite treatment in Miami: what you are dealing with
Builders and owner-builders in Miami-Dade and Broward need termite protection in place for new homes and additions. With a soil pretreat, the ground inside the forms is treated before the vapor barrier and concrete go in, and the exterior is treated again after final grade. That creates a treated layer termites cannot cross without picking up product.
Timing is everything on a job site. We work off your pour schedule, show up when the forms and plumbing are set, treat, and leave the paperwork your inspector and your file need. If the pour slips because of rain, we move with it.
Signs our technicians look for
You are pouring a new slab
New homes, garage conversions with new slab, room additions and detached structures all qualify.
Plumbing rough-in is finished
The pretreat goes after underground plumbing is in so the trenches are not disturbed afterward.
The inspector asks for a certificate
Termite protection documentation is part of the permit file on new construction.
You are adding a slab next to an old house
An addition is a good moment to treat the old foundation edge where it meets the new pour.
How we handle pre-construction termite treatment
- 01
Schedule off the pour date
Send us the address and pour date; we lock in a window and confirm the day before.
- 02
Treat inside the forms
Soil under the slab area is treated at the label rate after plumbing and before the barrier.
- 03
Final grade treatment
The exterior perimeter is treated once landscaping grade is set.
- 04
Paperwork for the file
Treatment certificate and posted notice for the inspector and the owner.
What changes in Miami-Dade and Broward homes
Most of our pretreat work is on infill homes in Miami's established neighborhoods, additions on 1950s block houses, and townhome projects in Doral, Miami Gardens and Homestead. Rain is the main scheduling problem in summer, since soil cannot be treated when it is saturated, so we keep in close contact with site supervisors from May through October.
Owners adding a room or enclosing a carport often forget the old foundation. When the new slab meets the existing house, that joint is an easy path for subterranean termites, so we treat both sides while everything is open.

Before and after the visit
- Send the pour date, site address and the superintendent's phone number.
- Have plumbing rough-in and forms complete before we arrive.
- Hold the vapor barrier until after treatment is finished.
What it typically costs
Questions about pre-construction termite treatment
Is a pretreat required for new construction in Florida?
Florida's building code requires termite protection for new construction, and soil pretreatment is one of the accepted methods. Your inspector and builder can confirm what your permit expects.
What if it rains on pour day?
Saturated soil cannot be treated properly. We reschedule around the weather and coordinate with the site so the pour is not delayed.
Do additions need a pretreat too?
Yes, new slab for an addition should be treated, and we recommend treating along the old foundation where the two meet.
Do you provide the certificate?
Yes. You get the documentation the job file needs on the day of treatment.
Where we do this work
Our technicians handle pre-construction termite treatment across Miami-Dade, Broward and Boca Raton. A few of the places we work most:
